AEP – Haines Branch Laydown Yard
Strip field and mow access edges, install environmental BMPs, install access road base aggregate and cap aggregate, install geotextile separation fabric and grade aggregate on yard.
AEP – Baileysville-Bolt 138kV Line Rebuild – Structure 33
Clear existing trees and brush from site. Install all necessary BMP controls. Remove and export topsoil. Excavate and remove subsided soil, buried trees and brush/soil mixture.
AEP – Baileysville-Bolt 138kV Line Rebuild – Structure 75 and 76
Clear existing trees and brush from sites. Install all necessary BMP controls. Remove and export topsoil and vegetation. Excavate, remove, and export subsided soil, buried trees and brush/soil mixture.
AEP – Baileysville-Bolt 138kV Line Rebuild – Access Road 13
Install all necessary BMPS and safety devices. Construct approximately 11,500 linear feet of access road. Install approximately 342 crane mats in the form of air bridges for multiple high pressure gas pipeline crossings.
AEP – Baileysville-Bolt 138kV Line Rebuild – Access Road 13
Install all necessary BMPS and safety devices. Construct approximately 11,500 linear feet of access road. Install approximately 342 crane mats in the form of air bridges for multiple high pressure gas pipeline crossings.